Alta Terra


Panama City

Project Location:
Panama City

Main Contractor:
BAUER Fundaciones Panamá, S.A.

Construction Period:
February - December 2014

Scope of Works:
Retaining wall structures (contiguous pile wall)

  • 116 piles with a diameter of 900 mm, with maximum lengths of 20 m
  • 3 piles with a diameter of 1,000 mm, with maximum lengths of 12 m
  • 240 soil nails, with lengths of 9 m
  • 321 m2 of shotcrete
  • 459 m2 of vertical drainage

Foundation Piles

  • 152 foundation piles with a diameter of 600 mm/
    1,670 mm