Scope of Works:

  • 44 piles with diameters of 910 mm, 1,180 mm,
    1,370 mm up to 36 meters in depth
  • 2,140 m2 diaphragm wall, thickness 600 mm, average depth 12.5 m
  • 1,993 m of temporary stressed anchors
  • 3,124 m of permanent double corrosion protection bar anchors, bar diameter 57.5 mm, 28 m average depth
  • Dewatering system with 8 wells
  • Excavation and disposal of 21,085 m3 of material
  • Comply with LEED Certification Core & Shell