Golden Point


Republic of Panama

Project Location:
Republic of Panama

Client / Main Contractor:
ROMARPRI

Construction Period:
December 2012 - March 2013

Scope of Works:

  • 97 temporary anchors (SCP), installing a total of
    approximately 1,708 m with maximum length of
    25.50 m