P.H. The Towers at 50th Street


Panama City

Project Location:
Panama City

Client / Main Contractor:
Pacific Developers

Construction Period:
June - December 2015

Scope of Works:

  • 396 piles - secant pile wall (880 mm diameter, 13.60 m average length)
  • 3,577 m of temporary stressed anchors (235 temporary anchors)
  • 35 foundation piles (piles with diameters of 610 mm, 1,180 mm, 1,370 mm, 1,900 mm up to 19.50 m average length)