Saneamiento de la Bahía


Republic of Panama

Project Location:
Republic of Panama

Client: 

Constructura Norberto Odebrecht, S.A.

Scope of Works:
Bored Pile - Digesters (December 2010)

  • 136 piles with diameters of 1,350 mm up to 16 m deep
  • 16 piles with diameters of 900 mm up to 16 m deep

Bored Pile - Modular Camera  (July 2011)

  • 37 piles with diameters of 1,350 mm up to 26 m deep

Secant pile wall - pumping shafts
(September 2008 - March 2009)

  • 1,198 m diameters of 1,350 mm up to 22.5 m deep

Secant Pile Wall - Output Shafts of the TBM

  • 810 m diameters of 1,350 mm up to 22.5 m deep

Ventilation Shaft

  • 3 piles with diameters of 1,800 mm up to 22 m deep