Tocumen Airport


Panama City

Project Location:
Panama City

Client / Main Contractor:
Constructora Norberto Odebrecht

Construction Period:
April - December 2013

Scope of Works:

  • 396 bored piles (depths between 16 to 20 m - 8 to 12 m cased - 900 and 1,370 mm diameter)
  • Drilling method: Kellybar drilling with polymer as drilling fluid