Torre Alfa Dorado


Republic of Panama

Project Location:
Republic of Panama

Client:
Dorado Dreams

Construction Period:
July - August 2011

Scope of Works:

  • 30 bored piles
  • 962.48 m² drilling volume
  • 8 piles with a diameter of 600 mm - 9.10 m
  • 8 piles with a diameter of 910 mm - 9.60 m
  • 10 piles with a diameter of 1,220 mm - 9.30 m
  • 1 pile with a diameter of 1,370 mm - 10 m
  • 3 piles with a diameter of 600 mm, 910 mm 1,050 mm, 1,350 mm, 1,835 mm - 10.50 m
  • Total quantity: 283 linear meters